EasyManua.ls Logo

Getinge 600 Series - User Manual

Getinge 600 Series
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
600 SERIES STEAM STERILIZERS
INSTALLATION MANUAL
61301607027 REV A US

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Getinge 600 Series and is the answer not in the manual?

Getinge 600 Series Specifications

General IconGeneral
TypeLaboratory Washer
ApplicationCleaning and sterilization of laboratory glassware
Dimensions (W x H x D)Varies by model
WeightVaries by model
Power SupplyVaries by model and region
Electrical SupplyVaries depending on the model and region
Water ConsumptionVaries by program and model
Steam ConsumptionVaries by program and model
Temperature RangeUp to 93°C (199°F)
Detergent DosingAutomatic dosing system
Control SystemMicroprocessor-controlled
ProgramsMultiple pre-programmed cycles for various applications. Customizable programs available.
ComplianceComplies with international standards
CertificationsCE
CapacityVaries depending on the model (600/630/650/680). Chamber volumes range from approximately 160 to 530 liters.
Water SupplyHot and cold water connections required. Demineralized water recommended for final rinse.

Summary

Preface

Before You Begin

Guidance for preparing to install the sterilizer.

Summary of Contents

Summary of the manual's eight sections.

Environmental Impact Assessment

Information on the environmental impact and disposal of materials.

Symbols on Equipment

Explains symbols for switches and indicators on the equipment.

Manual Conventions

Explains conventions used for clarity in the manual.

How to Use This Manual

Instructions on how to navigate and use the manual effectively.

Safety

General Safety

Overview of the sterilizer's intended use and built-in safety design.

Hot Surfaces and Pipes Warning

Warns about hot surfaces and pipes, advising caution to prevent burns.

Lockout Procedures

Procedures and rules for locking out the unit during maintenance for safety.

Safety Features

Highlights key safety features like door lockout and obstruction switches.

Isolating Device

Describes the main switch for isolating primary power from the sterilizer.

Product Liability Disclaimer

Explains consequences of unauthorized modifications or misuse of the unit.

Packaging

Before You Begin Packaging

Initial guidance on unpacking and handling the sterilizer.

Shipping Weight and Clearances

Information on weight, lifting equipment, and dimensions for handling.

Uncrating and Unpacking

Procedures for safely uncrating and unpacking the sterilizer unit.

Removing Front Panels

Procedures for safely removing the sterilizer's front panels.

Removing the Skid

Detailed instructions for removing the sterilizer from its shipping skid.

Installation Instructions

Before You Begin Installation

General advice and cautions before starting installation.

Utility Requirements

Details required steam, water, and electrical utility connections.

Tools and Materials Required

Lists all necessary tools and materials for installation.

Positioning and Leveling

Guidance on maneuvering, positioning, and leveling the sterilizer.

Leveling the Sterilizer Chamber

Steps to ensure the sterilizer chamber is level for proper operation.

Leveling the Sterilizer Door

Steps to level the sterilizer door and mounting plate mechanism.

Installing the Kick Panel

Instructions for installing the kick panel.

Re-attaching the Front Panels

Steps for re-installing the sterilizer's front panels.

Connecting the Plumbing

Instructions for connecting steam, water, and drain lines.

Connecting the Electrical Power

Requirements and procedures for connecting the sterilizer's electrical supply.

Anchoring the Sterilizer

Instructions for anchoring the sterilizer for stability and seismic safety.

Optional Equipment

Steam Boiler

Details on utility connections, models, and plumbing for steam boilers.

Booster Pump Package

Explains booster pump function, installation, plumbing, and electrical connections.

Universal Transformer

When a transformer is needed to step down customer power for sterilizer controls.

Uninterruptible Power Supply (UPS)

Information on UPS packages, connections, and mounting.

Water-Saver System

Overview of the water-saver system and its piping and electrical connections.

Water Treatment System

When steam boiler feedwater may require treatment based on quality.

Cabinet Package

Information on available cabinet packages and panel preparation/installation.

Drawings

List of Drawings

Lists drawings for technical data and utility requirements.

Installation Drawings

Refers to roughing-in and seismic anchorage drawings for installation.

Technical Data

Sterilizer Dimensions

Lists interior and exterior dimensions for the 600 Series Sterilizers.

Steam Supply Quality

Requirements for condensate-free steam supply quality for optimal performance.

Steam Boiler Feedwater Quality

Recommended feedwater quality specifications for the steam boiler.

Functional Check

Installation Check

Overview of checks to perform after installation for readiness.

Final Inspection by Getinge

Requirement for a final inspection by a Getinge representative before operation.

Validation by Customer

Customer responsibility for validating custom cycle parameters.

Related product manuals