EasyManua.ls Logo

Getinge 600 Series - Tools and Materials Required

Getinge 600 Series
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Instructions
4–2 INS 61301607027 Rev A US
TOOLS AND MATERIALS
REQUIRED
The following tools are required to install the sterilizer:
2 ft. spirit level
torpedo level
try square (or tape measure)
torque driver set
spanner wrench (supplied by Getinge—see Figure 4–1)
2 in. x 2 in. shims (see note below)
NOTE
Place shims under leveling feet and door motor mounting plate leveling
bolts to prevent damage to soft flooring materials such as linoleum. Single
door units require 8 shims, double door units require 16 shims.
The door alignment pins may be used as a guide when leveling the door.
See “Leveling the Sterilizer Door” on page 4–13.
FIGURE 4–1. INSTALLATION TOOLS
A07027-BL
Spanner Wrench
A
lignment Pins

Table of Contents

Related product manuals