Installation Instructions
4–2 INS 61301607027 Rev A US
TOOLS AND MATERIALS
REQUIRED
The following tools are required to install the sterilizer:
• 2 ft. spirit level
• torpedo level
• try square (or tape measure)
• torque driver set
• spanner wrench (supplied by Getinge—see Figure 4–1)
• 2 in. x 2 in. shims (see note below)
NOTE
Place shims under leveling feet and door motor mounting plate leveling
bolts to prevent damage to soft flooring materials such as linoleum. Single
door units require 8 shims, double door units require 16 shims.
The door alignment pins may be used as a guide when leveling the door.
See “Leveling the Sterilizer Door” on page 4–13.
FIGURE 4–1. INSTALLATION TOOLS
A07027-BL
Spanner Wrench
lignment Pins