EasyManua.ls Logo

Gossen MetraWatt ECUTEST ST BASE - Page 48

Gossen MetraWatt ECUTEST ST BASE
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECUTEST ST BASE(10) / PRO and SECULIFE ST BASE(25)
48 Gossen Metrawatt GmbH
Protection category detection for DUTs
with protective conductor
Connection test: checks whether the
DUT is connected to the test socket. In
the case of protection class I: whether or
not the two protective conductor termi-
nals are short-circuited.
Visual inspection passed
Visual inspection not passed
(test sequence is terminated,
test failed)
Resume test sequence
Note
If the plug is pulled out of the test
socket during the test sequence, the
test sequence is aborted immedi-
ately.
Green measured value:
complies with standard
Record measuring point
Delete last measuring point
Resume test sequence
The measured value is ascertained automat-
ically within a specified period of time. The
test sequence is then automatically
resumed.
Green measured value:
complies with standard
Function test passed
Function test not passed
(test sequence is terminated,
test failed)
Resume test sequence
Remove DUT from service (per instruc-
tions in the test sequence).
Manual evaluation of visual inspection
7
Test step – start evaluation
8
Test step – automatic evaluation
9
Manual evaluation of the function test
10

Table of Contents

Related product manuals