P a g e | 18
GETTING STARTED
This chapter provides basic installation instructions including the list of the packaging contents and also
information for obtaining the best performance with the GXV3350.
Equipment Packaging
Table 3: Equipment Packaging
Figure 1: GXV3350 Package Content
Note: Check the package before installation. If you find anything missing, contact your system administrator.
Connecting and Setting Up the GXV3350
The GXV3350 can be installed on the desktop using the built-in stand or attached on the wall using the
slots for wall mounting.