EasyManua.ls Logo

GREENLINE 40 - Page 38

GREENLINE 40
137 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Greenline 40
31
CAUTION!
Check the function of all bilge pumps at regular intervals.
Clear debris from the pump inlets.
If fitted, the sea cocks in the fore and aft peak bulkheads shall be kept
closed and shall only be opened to let water drain into the main bilges.
WARNING!
The combined capacity of the system is not intended to drain the craft in
the case of hull damage.

Table of Contents

Related product manuals