EasyManua.ls Logo

Groen CC20-E - Page 272

Groen CC20-E
314 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
Replacement Procedures
8-28
Water Inlet Valve
Installation
(continued)
6. Operate oven in Steam mode and allow boiler to fill. Check for leaks.
7. Allow oven to reach Ready status, then set timer for 5-minutes. This turns on
the condensate spray. Again check for leaks.
8. If there is no leakage, install back cover and right side cover (CC10-E,
CC20-E, and CC10-G).
Dual Water Valve Installation
CC20E and CC20G Glass Door and Solid Door Gasket
Replacement
(After Serial Number C7439MS for CC10E and GC7243MS for
CC20G)
Replacement Procedure
Removal
1. Turn off oven power.
2. Allow oven to cool.
3. Open the door.
4. Take hold of the gasket and pull the gasket from its groove.
5. Clean out the groove.
Installation
1. Press the gasket in the groove, inspect that the gasket is fully seated.
2. Close the door.
3. Check that the door adjustment is correct. Reference see page 8-5 in the
MAINTENANCE SECTION.
(Revised 1/02)

Related product manuals