6 Installing the Wet Bin
Topics Covered in this Chapter
▪ Raising the Load Auger
▪ Securing the Dryer Wet Bin Sides
▪ Installing the Belt Guard and Load Motor
▪ Installing the Drive Sheaves and Belts
▪ Installing the Belt Guard Cover
▪ Installing the Grain Intake Hopper
▪ The Parts of the Dryer Wet Bin
Raising the Load Auger
You must raise the load auger before you can install the dryer wet bin.
1. To raise the load auger:
• For dryers eight ft (2.44 m) use the handrails (A)
Figure 6-1 Handrail location for dryers eight ft (2.44 m) in length.
A
Handrails for 8 ft (2.44 m) dryer
• For dryers twelve ft (2.66 m) or longer, turn the turnbuckles on the lift kit (B)
PNEG–2088 Quiet Portable Dryer
39