EasyManua.ls Logo

GUDEL PR - General Prerequisites; Maintenance Intervals; Maintenance Tasks after

Default Icon
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.2 Maintenance tasks
7.2.1 General prerequisites
Prior to performing repair and maintenance tasks, do the following:
If vertical axes are present, secure them against falling
Switch off the system and padlock it to secure it against being switched on
again
Make sure that all necessary spare parts and wearing parts are at hand
Ü291
7.2.2 Maintenance intervals
The product is subject to natural wear and tear. When it wears out, un-
planned downtimes of your system can result. Güdel specifies the service life
and maintenance intervals of the product so as to ensure safe and continuous
operation. The maintenance intervals relate to the effective operating hours
of the product at a power-on time (POT) of 100%. Normal operating condi-
tions are assumed. These correspond with the parameters used by Güdel
when designing the product. If the conditions are rougher than assumed,
products may fail earlier. Adjust the maintenance intervals to your operating
conditions if necessary.
The definition is based on 5/7 working days per week.
MaintenanceSERVICE MANUAL Güdel planetary gear NR, SR, PR
9007199543219723_v1.1_EN-US
45

Table of Contents