EasyManua.ls Logo

GUDEL PR - General Inspection; Maintenance Tasks after

Default Icon
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.2.4 Maintenance tasks after 2,250 hours
7.2.4.1 General inspection
Performing a gen-
eral inspection
For the general inspection, perform a rough check of the entire product.
Perform the general inspection as follows:
1 Switch off the system and padlock it to secure it against being switched
on again
2 Check the inspection points as described in the inspection table
3 Take measures as described in the inspection table
The general inspection is complete.
Maintenance SERVICE MANUAL Güdel planetary gear NR, SR, PR
9007199543219723_v1.1_EN-US
48

Table of Contents