APCQ CAPACITOR BANKS
© 2022 Hitachi Energy. All rights reserved
Figure 32: External layout with circuit breaker (OT switch)– APCQ-L
6.4. Cable entry cubicle
The cable entry cubicle is a necessary option when multiple APCQ cabinets are ordered and must have one single
point of connection.
The cable entry cubicle can be used with one or up to four APCQ cubicle(s). It can be located left or right of the APCQ
cubicle and by default, it is located in the middle of the APCQ cabinets as per Figure 33
.
Figure 33: Cable entry cubicle with optional circuit breaker layout with four APCQ-R cubicles
For transportation, by default, each cabinets is delivered separately and must be assembled on site as per below in-
structions. The power cables to interconnect the APCQ cubicles are provided in the cable entry cabinet.
6.5. Assembly procedure on site of a multiple APCQ cabinets assembly
– Unpack the cabinet and move them to final location as per global layout drawing