APCQ CAPACITOR BANKS
STATUS
Approved
SECURITY LEVEL
Public
DOCUMENT ID
9AKK107680A4136
RE V.
E
LANG.
en
PAGE
39/47
© 2022 Hitachi Energy. All rights reserved
.
9. Maintenance
All maintenance operations should be carried on by qualified electrician. Please refer to Chapter 2 for the safety in-
structions.
The maintenance procedure is given here below and must be carefully archived during the all lifetime of the equip-
ment. Especially, it may help a lot for preventive maintenance and guarantee a long lifetime of the equipment.
The interval between two maintenances will depend on working conditions but should not be longer than one year.