To check for hardware issues:
1. On each enclosure, use the rocker switch on each power and cooling
module to power both power and cooling modules on. You can power on
the enclosures in any order.
2. After powering on the last enclosure, wait at least five minutes.
3. For both server modules at the same time, press and release the power
button on each server module to power the module on.
4. Wait for the server modules to finish booting.
5. Check the LEDs on the front of the enclosure, on the power and cooling
modules in the enclosure, on the I/Omodules in the enclosure, and on
the server modules.
6. If the LEDs indicate any hardware issues as described below, replace the
applicable components. For instructions on replacing hardware
components, see HCPS30 Node Assembly and Configuration.
The front of the enclosure has these LEDs:
Each power and cooling module has these LEDs:
Each I/Omodule has these LEDs:
Chapter 4: Refurbishing an HCP S30 Node
75
HCP S Series Node Refurbishment
Step 9: Check for hardware issues