Com=0
Process : Process prior to
long-term shutdown
Remove the tube connection block from reservoir
and clean the end of it.
And then place the tube connection block in a beaker charged
with 50ml of makeup.
When ready, press <Start/Continue>.
Operation guide
Circulation control [Service
]
2015.07.0712:45
InkDrainage
Systemclean
InkDrainage
Systemclean
InkDrainage
Systemclean
2015.07.0712:45
Com=0
InkDrainage
Systemclean
InkDrainage
Systemclean
InkDrainage
Systemclean
Process : Process prior to
long-term shutdown
Always pay attention to the following before operation.
・Depending on the ink types, storage temperature or storage
term the clogging formed by residual ink the circula-
tion system may occur even if this process is performed.
・For the storing method, it is recommended contact your
local distributor.
Operation guide
Proc. status:
Circulation control [Stop ]
Start/Continue
Abort
Open the "Circulation control" screen, and press the
Process prior to long-term shutdown key and the Start/Continue key.
1
The following guidance appears. Confirm the message and Press
Start/Continue key.
2
Start/Continue
Start/Continue
(1) Perform -(a) to -(c) of the procedure in “6.3 Replacing the ink”.
● Perform from ink drainage to place the ink reservoir tube connection block back into position.
● Perform operation in accordance with the operation guide on the screen.
(2) Return the direction of the ink filter so that connected tubes become the top.
22
Cleaning of the circulation system starts.
● Perform operation in accordance with the operation guide on the screen.
4