114
Scheduled Maintenance
Charge Water Pump And Hoses
Weekly/50 Hours:
• Inspect the charge water pump, hoses and
ttings for leaks and signs of wear or deterio-
ration. Any questionable or leaking component
should be repaired or replaced before operat-
ing the system.
• Run the pump and listen for unusual noises
and proper operation. Find and correct the
cause of unusual noises or erratic operation.
Bilge Pump And Automatic Switch
Weekly/50 Hours:
• Supply water to the high pressure pump stu-
ing box sump and monitor the operation of the
bilge automatic switch, bilge pump and drain
system. Correct any problems found.
Monthly/200 Hours:
• Remove the lid on the automatic switch sump
and clean out accumulated debris that could
interfere with the switch operation or water
ow to the pump.
• Test the switch for proper operation.