BCU 460, BCU 465 · Edition 11.19 121
Project planning information
14 Project planning information
14.1 Installation
Installation position: vertical (cable glands pointing
downwards) or down flat.
8888
Distance between BCU and burner: recommended
<1m (3.3ft), max.5m (16.4ft).
When installing, ensure that there is sufficient space to
open the BCU.
Securing the device from inside
Screw on the BCU with four screws, Ø4mm, min.
length 15mm.
Securing the device from outside
The unit remains closed.
Attach the BCU using four self-tapping screws
(M6x20mm, supplied with the unit).
163 mm
185 mm
7.28"
6.42"
For other mounting options using a fastening set or ex-
ternal securing bars, see page126 (Accessories).
14.2 Commissioning
Do not start the BCU until the parameter settings and
wiring are correct and the faultless processing of all
input and output signals complies with the local stand-
ards.