BCU 460, BCU 465 · Edition 11.19 140
Legend
22 Legend
Ready for operation
Safety interlocks (limits)
Control element position check
Controlled air flow
Remote reset
LDS
Safety limits (limits during start-up)
Gas valve
Air valve
Air/gas ratio control valve
Burner
Purge
External air valve control
Operating signal
Fault signal
Start 1 Start-up signal (BCU)
FLO
Input for Flameless/menox® mode signal
Input for high temperature operation
PZ
Pressure switch for tightness control (TC)
PZH
Pressure switch for maximum pressure
PZL
Pressure switch for minimum pressure
PDZ
Differential pressure switch
M
Actuator with butterfly valve
TC Tightness control
p
u
/2 Half of the inlet pressure
p
u
Inlet pressure
p
d
Outlet pressure
V
p1
Test volume
GZL
Valve with proof of closure switch
Three-point step switch
Input/Output, safety circuit
I
N
Current consumption of sensor/contactor
t
L
Tightness control opening time
t
M
Measurement time during tightness test
t
P
Tightness control test period (= 2 x t
L
+ 2 x t
M
)
t
FS
Flame proving period
t
MP
Minimum pause time
t
NL
Over-run time
t
SA
Safety time on start-up
t
SB
Safety time during operation
t
VZ
Pre-ignition time
t
PV
Pre-purge time
t
RF
Controller enable signal delay time