RECOMMENDED SEQUENCE TO PERFORM THE CONTROL UNIT PROGRAMMING 
 
 
The following operation sequence is recommended to perform the initial programming of the control unit, to 
prevent mistakes and consequent loss of time. 
The details of each operation are pointed out in the following pages.
 
 
- Perform the wiring of the control unit lines and perform the appropriate tests as described in the 
installation manual before powering the control unit. 
- Make some photo-copies of the programming sheet that can be found at the end of this manual and 
record on these sheets the necessary information for ALL sensors, modules, software zones, CBE and 
groups.
 
 
 
 From the Programming menu select the “System” menu. 
 
  Select the  “Line”  item and program the type of connection which  has been performed on the installed 
lines ( open line or closed loop
 ).   
 
 From the Programming menu select Point Programming  
 
 Select the Auto-Learn item, and press the enter key 
  and subsequently enter the number of lines for 
which the procedure must be started.  
Through this operation all the devices installed on the lines are recognized and loaded in the control unit 
memory according to their Hardware TYPE ID and with the default data. 
 
  At the end of the procedure check that the devices detected by the control unit during the Auto-
Learn are those really installed, and confirm.  
This will record all data in the Panel memory. 
In any case user can edit and modify the recorded data in case it needs. 
 
 From the Point Programming menu select “Detectors” 
 
  Associate the detector with the appropriate zone 
 
  Program the detector CBE ( Control by Event action). 
 
 From the Point Programming menu select the “Modules” item 
 
 Program the Software Type-ID (if it is different from the default value assigned ) 
 
  Associate the module with the appropriate zone 
 
  Program the module CBE ( Control by Event action). 
 
 
At the end of this programming steps the control unit is ready to manage the Alarm system 
 
Additional details can be added to the mentioned, as for example a text description for each 
detector, module or zone. 
 
For further information or specific parameters description see the following paragraphs.