A-1
Appendix A - Site Preparation Kit
This Appendix contains the following information:
• Pre-installation Worksheet
• Space Planning Kit
• System power requirements and heat dissipation worksheets
Hewlett-Packard recommends that you copy the worksheets before you begin using them. Then, if 
more copies are needed in the future, you will have an unmarked copy of the worksheets available.
Pre-Installation Worksheet
Table A-3. Pre-Installation Activities.
Timing Activity ✓ Date
6 weeks before installation Select the location for the system. Use the Site 
Preparation Guide to satisfy any requirements to 
ensure the site is ready when the system arrives.
❑
Assign a person the responsibility of system prin-
cipal operator.
❑
Plan the physical arrangement of the system and 
its peripherals. The space planning kit allows you 
to plan details before the system arrives.
❑
Order supplies that are required for uninterrupted 
operation of the system (consumable supplies).
❑
At system delivery Inspect each shipment as it is delivered. Note 
comments and dates in shipment schedule.
❑
When all equipment arrives, contact the CE to 
schedule the installation and verify that the site 
meets the system requirements. Installation will 
be scheduled within three working days after 
Hewlett-Packard has been contacted.
❑
System installation Arrange for the system manager to assist the CE 
with the installation process.
❑