Installation preparation checklist
Table 4 Installation preparation checklist
Item Requirements Result
Installation
site
Ventilation
There is a minimum clearance of 10 cm (3.9 in) around
the inlet and exhaust vents for heat dissipation of the
switch chassis.
A ventilation system is available at the installation site.
Temperature 0°C to 45°C (32°F to 113°F)
Relative humidity 5% to 95% (noncondensing)
Cleanness
Dust concentration 3 × 10
4
particles/m
3
No dust on desk within three days
ESD prevention
The equipment and rack are well grounded.
The equipment room is dust-proof.
The humidity and temperature are at a proper level.
Wear an ESD-preventive wrist strap. Make sure the wrist
strap makes good skin contact and is well grounded
when installing FRUs.
Place the removed interface card on an antistatic
workbench, with the face upward, or put it into an
antistatic bag.
Touch only the edges instead of electronic components
when observing or moving a removed interface card.
EMI prevention
Take effective measures to protect the power system from
the power grid system.
Separate the protection ground of the switch from the
grounding device or lightning protection grounding
device as far as possible.
Keep the switch far away from radio stations and radar
and high-frequency devices working in high current.
Use electromagnetic shielding when necessary.
Lightning
protection
The grounding cable of the chassis is well grounded.
The grounding terminal of the AC power receptacle is
well grounded.
A port lightning arrester is installed. (Optional)
Electricity safety
Equip a UPS.
In case of emergency during operation, switch off the
external power switch.