Installing the tower-to-rack conversion kitInstalling the tower-to-rack conversion kit
In this procedure, left and right terminology is from the perspective of a user facing the front of the rack.
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. If installed, unlock and remove the security padlock and/or the Kensington security lock.
For more information, see the lock documentation.
5. Install the rack rails and server tray .
6. Install the server into the rack .
The installation is complete.