2. Verify the switch passes self test
Before mounting the switch, verify it is working properly by plugging it into a power source and confirming
that it passes self test.
Procedure
1. For the 1920S 24- and 48-port switches, connect the power cord supplied with the switch to the power
connector on the back of the switch, and then into a properly grounded electrical outlet.
For the 1920S 8-port switches, connect the AC/DC adapter’s power cord to the power connector on
the back of the switch, and then plug the AC/DC power adapter into a nearby properly grounded
electrical outlet.
HPE OfficeConnect 1920S 24- and 48-port switches
Connect the power cord to the switch and an AC power outlet.
HPE OfficeConnect 1920S 8G switch
Connect wall plug-in AC/DC power adapter to the switch and then to an AC power outlet.
HPE OfficeConnect 1920S 8G PPoE+ switch
Connect inline AC/DC power adapter to the switch and then to an AC power outlet.
16 2. Verify the switch passes self test