EasyManua.ls Logo

HPE ProLiant DL180 Gen10

HPE ProLiant DL180 Gen10
158 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20. Install the air bale.
21.
Install the access panel.
22.
Install the server into the rack.
23.
Connect all peripheral cables to the server.
24.
Connect each power cord to the server.
25.
Connect each power cord to the power source.
26.
Power up the server.
27.
If removed, install the front bezel.
The installation is complete.
Optical drive cage and optical drive options
Installing the optical drive in the LFF chassis
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
T-15 Torx screwdriver
Procedure
1. If installed, remove the front bezel.
2.
Power down the server.
3. Remove all power:
Hardware options installation
63

Table of Contents

Other manuals for HPE ProLiant DL180 Gen10

Related product manuals