EasyManua.ls Logo

HPE ProLiant DL388 Gen10 - Installing a Front 8 SFF SAS;SATA Drive Cage in Box 2

HPE ProLiant DL388 Gen10
195 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Connect the power and data cables.
10. Install the fan cage.
11. Install the air baffle.
12. Install the access panel.
13. Slide the server into the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server.
The installation is complete.
Installing a front 8SFF SAS/SATA drive cage in box 2
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
Extend the server from the rack.
Remove the server from the rack .
4. Remove the access panel.
5. Remove the air baffle.
6. Remove the fan cage.
7. Remove the bay blank.
Hardware options installation 97

Table of Contents

Other manuals for HPE ProLiant DL388 Gen10

Related product manuals