EasyManua.ls Logo

HPE ProLiant ML110 Gen9

HPE ProLiant ML110 Gen9
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removal and replacement procedures 30
o
Hot-plug SFF drive blank
To replace the SFF drive blank, while pressing the release latch, slide the component into the
bay until it is fully seated.
Hot-plug drive
CAUTION: To prevent improper cooling and thermal damage, do not operate the server
unless all bays are populated with either a component or a blank.
To remove the component:
1. Back up all server data on the drive.
2. Remove the front bezel (on page 25).
3. Determine the status of the drive from the drive LED definitions ("Hot-plug drive LED definitions"
on page 82).
4. Remove the hot-plug drive.
To replace the component, reverse the removal procedure.
4-bay LFF hot-plug drive cage

Table of Contents

Related product manuals