EasyManua.ls Logo

HPE Synergy 12000 Frame

HPE Synergy 12000 Frame
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Item Name Description
16 Reusable zip ties for power supplies (single-phase
frames only)
3
Reusable zip ties that help prevent single-
phase power cables from disconnecting from
the power connectors.
17 CAT6A cable or DAC cable or SFP+ DAC cable
1
,
3
CAT6A or DAC cable or SFP+ cable for
cabling frames, depending on the frame link
module ordered.
200 ft (6096 cm) cable—Used for
cabling two consecutive frames.
1000 ft (30480 cm) cable—Used for
cabling the top frame to the bottom
frame in a rack.
2100 ft (64008 cm) cable—Used for
cabling management links requiring long
runs to the top of the rack.
18
HPE Synergy Start Here Poster
3
The quick setup poster provides an overview
of the installation process.
19 Installation instructions for compute modules, options,
and interconnects
3
The printed installation instructions for HPE
Synergy components.
20 HPE Synergy 12000 Frame Rack Template
3
The printed template for locating the
positions of frames, rack rails, and cage nuts
in a rack.
1
Quantity as ordered
2
Quantity and type as ordered
3
Not shown
12 Planning the installation

Table of Contents

Other manuals for HPE Synergy 12000 Frame

Related product manuals