EasyManua.ls Logo

Huawei DBS3900 - Page 142

Huawei DBS3900
556 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 6-126 Installing a monitoring signal cable between cascaded CMUAs
Step 4 Install a monitoring signal cable between the BBU in the APM30H and the CMUA in the
TMC11H, as shown in Figure 6-127.
1. Connect one end of the monitoring signal cable between the BBU in the APM30H and the
CMUA in the TMC11H to the COM_IN port on the CMUA.
2. Connect the other end to the MON0 port on the UPEU in the BBU.
DBS3900 (Ver.B)
Installation Guide
6 Outdoor Scenario with AC Power Supply (BBU Installed
in an APM30H)
Issue 06 (2011-09-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
129

Table of Contents

Other manuals for Huawei DBS3900

Related product manuals