10.6 Power-On Check
Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
CAUTION
The DBS3900 must be powered on within seven days after it is unpacked, and the period for
which the DBS3900 remains powered-off during maintenance must not exceed 48 hours.
Power-On Check in the AC Power Supply Scenario
Figure 10-36 shows the power-on check when a DBS3900 is deployed in the AC power supply
scenario.
DBS3900 (Ver.B)
Installation Guide
10 Outdoor Scenario with AC Power Supply (BBU Installed
in an OMB)
Issue 06 (2011-09-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
365

Table of Contents

Other manuals for Huawei DBS3900

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei DBS3900 and is the answer not in the manual?

Huawei DBS3900 Specifications

General IconGeneral
BrandHuawei
ModelDBS3900
CategoryAccessories
LanguageEnglish

Related product manuals