Check the installation items, installation environment, and cable-related items after the cabinets
and devices are all installed.
6.8 Power-On Check
Before a DBS3900 starts operating, you must check the power-on status of the cabinet and
components in it.
6.9 Subsequent Operations
You must perform subsequent operations after installing a base station and checking related
hardware installation.
DBS3900 (Ver.B)
Installation Guide
6 Outdoor Scenario with AC Power Supply (BBU Installed
in an APM30H)
Issue 06 (2011-09-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
27