a. Remove the optical cable to be replaced.
b. Connect the new optical cable.
n Connect the new optical cable to the same port as the removed one.
n Connect the optical cable to the optical module securely.
i. Insert the optical module into the optical port. See (1) in Figure 7-16.
ii. Close the latch on the optical module to secure it. See (2) in Figure 7-16.
iii. Insert the optical cable into the optical module. See (3) in Figure 7-16.
Figure 7-16 Connecting an optical cable
l When you use an SFP+ cable:
1. Remove the SFP+ cable to be replaced.
Gently push the power connector inwards and pull the latch out to remove the SFP+
cable.
NO TICE
Do not directly pull out the latch.
FusionServer Pro 2288H V5 Server
User Guide
7 Installation and Configuration