Figure 6-9 Crimping an OT terminal
(A) Core wire (B) Insulation layer (C) Heat shrink tubing
(D) Heat gun (E) Hydraulic pliers
Step 2 Connect the ground point of the power control module to the external ground
point.
Figure 6-10 Grounding the PE cable
LUNA2000-(5-30)-S0
User Manual 6 Electrical Connection
Issue 15 (2024-01-12) Copyright © Huawei Digital Power Technologies Co., Ltd. 88