EasyManuals Logo

Huawei SUN2000-M3 User Manual

Huawei SUN2000-M3
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #116 background imageLoading...
Page #116 background image
F Setting Dry Contact Scheduling
Parameters
Procedure
Step 1 On the home screen, choose Settings > Power adjustment and set Dry contact
scheduling to .
Figure F-1 Setting dry contact scheduling parameters
----End
SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual F Setting Dry Contact Scheduling Parameters
Issue 11 (2023-01-10) Copyright © Huawei Technologies Co., Ltd. 107

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-M3 and is the answer not in the manual?

Huawei SUN2000-M3 Specifications

General IconGeneral
TypeString Inverter
Rated AC Grid Frequency50 Hz / 60 Hz
DC Connection TypeMC4
Protection DegreeIP65
Cooling MethodNatural convection
CategoryInverter
Adjustable Power Factor Range0.8 leading - 0.8 lagging
Total Harmonic Distortion (THD)≤ 3 %
Operating Temperature Range-25°C to 60°C
CommunicationRS485
Efficiency98%
Protection LevelDC reverse polarity protection, AC overcurrent protection, AC short-circuit protection, Overvoltage protection, Insulation monitoring, Residual current monitoring unit, Arc fault detection