EasyManua.ls Logo

Huawei SUN2000-M3 - Scenario in Which Sun2000 S Are Connected to Other Management Systems; Energy Control; Grid-Tied Point Control

Huawei SUN2000-M3
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting to SmartPVMS Quick Guide (Inverters + SmartLogger3000 +
MBUS Networking)
.
NO TE
Inverters manufactured after July 20, 2022 do not support the AC MBUS.
7.2 Scenario in Which SUN2000s Are Connected to
Other Management Systems
Step 1 Open the SUN2000 app, scan the QR code of the SUN2000 or manually connect
to the WLAN hotspot to access the device commissioning screen.
Step 2 Select installer and enter the login password.
Step 3 Tap Log in to access the quick settings screen or SUN2000 home screen.
Figure 7-4 Logging In to the app
----End
7.3 Energy Control
7.3.1 Grid-tied Point Control
Function
Limits or reduces the output power of the PV power system to ensure that the
output power is within the specied range.
Procedure
Step 1 On the home screen, choose Power adjustment > Grid-tied point control.
SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual 7 Man-Machine Interaction
Issue 11 (2023-01-10) Copyright © Huawei Technologies Co., Ltd. 66

Table of Contents

Related product manuals