Updated 5.7.1 Communication Modes.
Updated D Rapid Shutdown.
Issue 07 (2022-01-30)
Updated 4.3 Selecting an Installation Position.
Updated 8.2 Routine Maintenance.
Issue 06 (2022-01-04)
Updated 5.2 Preparing Cables.
Updated 7.1.2 Creating a PV Plant and a User.
Updated 7.3.1 Grid-tied Point Control.
Updated 7.3.2 Apparent Power Control on the Inverter Output Side.
Updated 10 Technical 
Specications.
Updated A Grid Codes.
Issue 05 (2021-11-25)
Updated 5.4 Connecting the AC Output Power Cable.
Issue 04 (2021-07-25)
Updated 5.2 Preparing Cables.
Updated 10 Technical Specications.
Issue 03 (2021-04-15)
Updated 2.1 Product Introduction.
Updated 5.2 Preparing Cables.
Updated 5.5 Installing the DC Input Power Cable.
Updated 10 Technical Specications.
Issue 02 (2020-11-20)
Updated 2.3 Label Description.
Updated 4.3 Selecting an Installation Position.
Updated 5.2 Preparing Cables.
Updated 5.7.1 Communication Modes.
Updated 10 Technical 
Specications.
SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual About This Document
Issue 11 (2023-01-10) Copyright © Huawei Technologies Co., Ltd. iv