EasyManuals Logo
Home>IBM>Server>iSeries 800

IBM iSeries 800 User Manual

IBM iSeries 800
622 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #138 background imageLoading...
Page #138 background image
5. Install an L3 module.
6. Press the Rocker switch forward to the MCM/L3 Pwr/GND position. This checks the L3s for power to
ground shorts. It also checks the MCM for power to ground shorts. Note the following:
v The green L3 LED must be lit for a pass condition. If the amber L3 is lit, there may be a short
between one of the two L3 voltages and GND, which is a fail state, or the combination of memory
books, I/O books, and L3 in parallel are creating a low resistance. Perform the following:
a. Disengage memory books followed by I/O books one at a time.
b. Repeat this test after each is removed until either the L3 test passes, or all memory and I/O are
disengaged and the L3 test remains in a fail state.
c. If after disengaging all memory and I/Os, the L3 LED remains lit, remove the L3 and inspect the
interposer for shorts.
d. Reinstall the L3 once and repeat the test. If the fail persists, replace the L3.
v
The green MCM LED must be lit for a pass condition. If the amber MCM Led is lit, there is a
short across the MCM voltage and GND. Perform the MCM/passthru test and correct the short
condition before powering on.
7. Press the Rocker switch backward to the L3 PWR/PWR position. Both the green and amber MCM
LED will be off. Power is removed from these circuits when the switch is in this position. Note the
following:
The green L3 LED must be lit for a pass condition. If the amber L3 LED is lit, there is a short
between the two L3 power domains.
Perform the following:
a. Remove the L3 and inspect the interposer for shorts.
b. Reinstall the L3 once and repeat the test. If the fail persists, replace the L3.
8.
Repeat steps 5 (See page 126), 6 (See page 126), and 7 (See page 126) until all required L3s are
installed.
This
ends the procedure.
Test
method 2: Testing MCM and passthru modules for a short circuit using a multimeter and capacitor
book: There are two procedures that are covered in this topic:
v Testing MCM and passthru modules for a short circuit (See page 126)
v Testing L3 cache modules for a short circuit (See page 128)
Test method 2: Testing MCM and passthru modules for a short circuit
Perform this test to ensure that a short circuit was not created when installing an MCM or passthru
module. You can use one of the following two options during the MCM replacement:
v Install and use a multimeter and new capacitor book (part 44P2471)
v Install and use a multimeter, the original capacitor book, and MCM/L3 module short-circuit test tool
(part 44P0209)
Note: This procedure should only be performed by trained personnel. Ensure the UEPO switch is in the
Off position before performing this procedure.
MCM installation shorts test, procedure 1
1. Power down the system. See Power on/off the system and logical partitions.
2. Ensure the UEPO is off.
3. Disengage all DCAs from the planar.
4. Choose from the following options:
v If you are using the new capacitor book option: Install the Capacitor book in CAP
base location (M33), with no meter attached.
126 Hardware (Remove and Replace; Part Locations and Listings)

Table of Contents

Other manuals for IBM iSeries 800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM iSeries 800 and is the answer not in the manual?

IBM iSeries 800 Specifications

General IconGeneral
BrandIBM
ModeliSeries 800
CategoryServer
LanguageEnglish

Related product manuals