EasyManua.ls Logo

IBM RS/6000 Enterprise Server M80 - Page 113

IBM RS/6000 Enterprise Server M80
567 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 1522-12
Reconnect the ac power cable(s) to the power distribution unit.
Perform the following:
1. Disconnect the ac power cable from each power supply of the CEC drawer.
2. Use a multimeter to measure the ac voltage at the drawer end of each ac power cable.
Is
the ac voltage from 200 V ac to 240 V ac?
NO Replace the ac power cable(s) unit.
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
YES Go to “Step 1522-13.”
Step 1522-13
Disconnect the ac power cable (dc power cable for a dc-powered system) to each power supply of the
CEC drawer and remove the following components from the CEC drawer, one at a time, in the sequence
listed:
1. CEC processor card(s)
2. CEC RIO adapter card
3. CEC memory card(s)
Reconnect
the ac power cables (dc power cable for a dc-powered system) to each power supply of the
CEC drawer and attempt to power on the CEC.
Does the CEC power on?
NO Go to “Step 1522-16” on page 96.
YES Go to “Step 1522-14” on page 96.
Chapter 3. Maintenance Analysis Procedures 95

Table of Contents

Other manuals for IBM RS/6000 Enterprise Server M80

Related product manuals