EasyManua.ls Logo

IBM RS/6000 Enterprise Server M80 - Page 118

IBM RS/6000 Enterprise Server M80
567 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 1523-7
Are all SPCN cables seated firmly and connected correctly between the primary I/O drawer,
secondary I/O drawers and CEC drawer?
NO Fix the SPCN cable connections.
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
YES Go to “Step 1523-8.”
Step 1523-8
Is this machine connected to dc power?
NO Go to “Step 1523-12” on page 101.
YES Go to “Step 1523-9.”
Step 1523-9
Are all circuit breakers reset at the rack power distribution panel?
NO Reset the popped breaker by first turning off, then turning on.
This ends the procedure. Go to MAP 0410: Repair Checkout in the RS/6000 and Eserver
pSeries Diagnostic Information for Multiple Bus Systems.
YES Go to “Step 1523-10” on page 101.
100 Service Guide

Table of Contents

Other manuals for IBM RS/6000 Enterprise Server M80

Related product manuals