EasyManua.ls Logo

Ideal Boilers LOGIC Code Combi 26 - Page 20

Ideal Boilers LOGIC Code Combi 26
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
INSTALLATION
Ideal Logic Code Combi - Installation and Servicing

18
FLUE EXTENSION DUCTS - Fortotaluelengthsgreaterthan575mm
Pack D Flue extension duct kit contents
Flue duct support
Flue support cutting aid
(shown folded up)
Wall plugs - 4 off
Extension duct & clamp
1.0m (39") long
No. 10 x2" wood screw - 4 off
nm8732
17
SETTING THE FLUE - SIDE Wall thicknesses of 148 to 378mm
Notes.
a. If using the extension ducts go to Frame 18.
b. For shorter ue requirements use non telescopic B Pack.
1. 
2. Measure distance from side of boiler to inside of wall and

3. 

4. 

5. 
6. 
nm8945
L + 115
Drill hole
Adhere sealing tape
Measurement to be
taken from this point
NON TELESCOPIC FLUE - Wall thickness of 115mm to 440mm
TELESCOPIC FLUE - Wall thickness of 150mm to 375mm
Notes.
If using the extension ducts go to Frame 18.
1. 
2. 

3. 

4. Cut the inner tube to a length 20mm longer to aid
engagement, using the cutting aid provided
Measure from
this
RING
3G9675
206279-1.indd 20 06/01/2011 09:10:03

Related product manuals