EasyManua.ls Logo

Immergas AUDAX PRO 4 V2 - 13 Completion of Installation

Immergas AUDAX PRO 4 V2
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
13
COMPLETION
OF INSTALLATION.
- Check the following aer having completed the installation.
Installation
Outdoor unit
- Check the external surface and the inside of the outdoor unit.
- Is a short-circuit possible?
- Is the position well ventilated and is there clearance space for assistance?
- Is the outdoor unit firmly fixed?
Indoor unit
- Check the external surface and the inside of the indoor unit.
- Is the position well ventilated and is there clearance space for assistance?
- Check whether the centre of the indoor unit is fixed and if it is installed horizontally
Adding refrigerant
- Are the length and difference between the refrigerant pipes within the admissible range?
- Is the pipe suitably insulated?
- Has the amount of additional refrigerant been weighed correctly?
Installation of drain pipe
- Check the drain pipe of the outdoor unit and of the indoor unit.
- Was the drain test completed?
- Is the drain pipe suitably insulated?
Perform the wiring
- Was the outdoor unit earthed 3?
- Is a 2-wire cable used?
- Is the length of the wire within the limited range?
- Is the wiring path correct?

Table of Contents

Related product manuals