Acceptance and Installation 
  Copyright © ITECH Electronic Co., Ltd.  1 
Chapter1 Acceptance and Installation 
1.1 Confirm package contents 
Open the package and check the articles within package box before operation. 
In case of any non-conformity, missing or appearance wearing, please contact 
ITECH immediately. 
The package box should comprise: 
 
 
 
Electronic 
load 
1  IT8800 series 
IT8811/IT8812/IT8812B/ 
Power line 
1 
IT-E171/IT-E1
72/ 
IT-E173/IT-E1
74 
The User may select different 
power lines based on local 
outlet specification. For 
detailed specifications, refer to 
1.7 Connecting the Power 
CD  1  - 
Comprising user manual and 
documents related to 
programming and grammatical 
alignment 
Test report before delivery. 
communicati
 
NOTE 
After confirming that package contents are consistent and correct, please 
appropriately keep package box and related contents. The package requirements 
should be met when the instrument is returned to factory for repair. 
IT8800 Series load is supplied with the following optional accessories (sold 
separately): 
To mount the instrument on a special rack, 
user may select this optional. 
 
1.2. Installation position 
The instrument should be installed at well-ventilated and rational-sized space. 
Please select appropriate space for installation based on the electronic load 
size.