EasyManua.ls Logo

ITW Dynatec DYNAMELT D15 Series - Re-Assembly Procedures

Default Icon
234 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 8-4 Disassembly
Revised 10/14
ITW Dynatec
D15/D25/D45 V6 D CL ASU Manual #20- 63
CAUTION: In general, all O-RINGS AND SEALS should be replaced w henever
hot -melt equipment is re-assembled. All new o-rings should be l ubricated with
o-ring lube (PN N07588).
CAUTION: TAPERED PIPE THREADS are found on air line fittings used with the
pump air supply and on the outlet filter manifold. Apply thread sealant (PN
N02892) whenever tapered pipe threaded parts are re-assembled.
CAUTION: SOME FITTINGS used for adhesive on the ASU have straight threads
and o-ring seals. Use of th read sealant is not necessary with these parts, but the
o-ring seals should be clean and lubricated. Tighten straight-threaded parts and
fittings until their shoulders are firmly seated against the pump body (or other
surface). Excessive torque may damage straight-threaded parts and the use of
power wrenches is not recommended.
CAUTION: HOT-MELT RESIDUE should be cleaned from parts before they are
re-assembled, particularly from threaded parts. As a precaution against adhesive
residue preventing proper re-assembly, threaded parts should always be
re-tightened at operating temperature.
Pump O-ring Replacement:
1. Remove the pump from the ASU (see instructions on
previous page).
2. Remove the external pump seal from its groove on the
back of the pump.
3. Reference the pump exploded-view illustration (in Chapter
10) for your specific pump.
4. Install the new seal.
5. Re-assemble components.
Re-Assembly Procedures
Unless noted, the ASU’s re-assembly is simply the reverse sequence of the disassembly proce-
dures. However, the following “cautions” should be followed (whenever they apply) for proper
re-assembly:
Pump
Pump O-ring

Table of Contents

Related product manuals