23
UMG 511
Fig. measurement in a single-phase 3 conductor
network. I3 and U3 are not calculated and set to
zero.
Fig. measurement in a three-phase 3 conductor
network with asymmetrical load.
Fig. measurement in a three-phase 3 conductor
network with asymmetrical load.
Fig. measurement of a phase in a three-phase 4
conductor network.