EasyManua.ls Logo

JR Voyager E - Tail Pitch Control Rod Assembly; Tail Control Rod Installation

JR Voyager E
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JR PROPO
4-3
4-4
Universal Ball Link (2)
Tail Control Rod (478 mm)
Tail Control Rod Bushing (2)
Universal Ball Link
9 mm
9 mm
Tail Control Rod (478 mm)
Tail Guide Clamp (2)
2 x 8 mm Self Tapping Screw (2)
Tail Control Bushing
.................................. 2 pcs
2 x 8 mm Self Tapping Screw
170 mm
170 mm
21
Tail Pitch Control Rod Assembly
Tail Control Rod Installation
Pass the tail control rod through the rod
guide collars, then attach the universal
links to both ends of the tail control rod
to the length shown below.
Adjust the space and the angle of the tail guide
clamps so that the tail control rod will move
freely. Refer to the diagram for the correct
spacing dimensions.

Table of Contents

Related product manuals