EasyManuals Logo

Jungheinrich EJC 112 User Manual

Jungheinrich EJC 112
87 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
C 1
1004.GB
C Transport and Commissioning
1 Lifting by crane
F
Only use lifting gear with sufficient capacity (for transport weight see truck data plate).
Z
The attachment points (1) are provided for lifting the truck with crane lifting gear (in
the middle with the ZZ mast).
Park the truck securely (see Chapter E).
Strap the lifting gear onto the attachment
points (1) (in the middle with the ZZ
mast).
M
Attach the crane slings to the strap points
so that the truck cannot slip. Lifting slings
should be fastened in such a way that they
do not come into contact with any parts of
the truck when it is being raised.
2 Commissioning
M
Operate the truck only with battery current. Rectified AC current will damage the
electronic components. The battery leads (tow cable) must be less than 6m long.
F
It is forbidden to raise loads if the truck is operated via a tow lead with an external
battery.
To prepare the truck after delivery or after transport, proceed as follows:
Check the truck for completeness and satisfactory condition of the equipment.
Install battery (where required). Do not damage battery cable.
(see chapter D).
Z
Set the characteristic curve (charging curve) on the charger (see Chapter D).
Charge the battery (see Chapter D).
If necessary, adjust the combination instrument to match the battery type (see
Chapter D).
Start up the truck as indicated.
(see Chapter E).
Z
When the truck is parked, the running surface of the tyres will flatten. The flattening
will disappear after a short operating time of the truck.
1
C 1
1004.GB
C Transport and Commissioning
1 Lifting by crane
F
Only use lifting gear with sufficient capacity (for transport weight see truck data plate).
Z
The attachment points (1) are provided for lifting the truck with crane lifting gear (in
the middle with the ZZ mast).
Park the truck securely (see Chapter E).
Strap the lifting gear onto the attachment
points (1) (in the middle with the ZZ
mast).
M
Attach the crane slings to the strap points
so that the truck cannot slip. Lifting slings
should be fastened in such a way that they
do not come into contact with any parts of
the truck when it is being raised.
2 Commissioning
M
Operate the truck only with battery current. Rectified AC current will damage the
electronic components. The battery leads (tow cable) must be less than 6m long.
F
It is forbidden to raise loads if the truck is operated via a tow lead with an external
battery.
To prepare the truck after delivery or after transport, proceed as follows:
Check the truck for completeness and satisfactory condition of the equipment.
Install battery (where required). Do not damage battery cable.
(see chapter D).
Z
Set the characteristic curve (charging curve) on the charger (see Chapter D).
Charge the battery (see Chapter D).
If necessary, adjust the combination instrument to match the battery type (see
Chapter D).
Start up the truck as indicated.
(see Chapter E).
Z
When the truck is parked, the running surface of the tyres will flatten. The flattening
will disappear after a short operating time of the truck.
1

Table of Contents

Other manuals for Jungheinrich EJC 112

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jungheinrich EJC 112 and is the answer not in the manual?

Jungheinrich EJC 112 Specifications

General IconGeneral
BrandJungheinrich
ModelEJC 112
CategoryLifting Systems
LanguageEnglish

Related product manuals