EasyManua.ls Logo

Keithley 2790 - Figure 5-3 Test Connections - Shunt Bar, HIPOT, and Bridgewire Testing - Single Stage Inflator

Keithley 2790
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-6 Model 2790 SourceMeter
®
Switch System User’s Manual
Figure 5-3
Test connections – shunt bar, HIPOT, and bridgewire testing – single stage inflator
Single Stage Inflator
SRC HI
SEN HI
SRC LO
SEN LO
Ch 1
Ch 2
Bank 1
J101
SRC HI
SEN HI
SRC LO
SEN LO
Ch 5
Bank 2
J102
Ch 3
Keithley 7751/7753
Shunt
Bar
B) Bridgewire Testing
A) Shunt Bar and
HIPOT Testing
Built-in shunt. Available for
use during HIPOT testing.
SRC HI
SEN HI
SRC LO
SEN LO
Ch 8
Bank 3
J103
A1
B1
Some wires are shown in bold
to make it easier to follow the
signal paths.
NOTE
Channel 3 closed for HIPOT and
open for shunt bar and bridgewire tests.
For high ohms measurements (>1G),
it is recommended that the DUT be
connected between two different
banks (for example, Bank 1 and
Bank 3 as seen in test connection
figures) to reduce the possibility of
measurement error caused by leakage
resistance.
NOTE

Table of Contents

Related product manuals