HOW TO PERFORM AUTOMATIC TESTS
If an external connection e.g. a probe is required, the display will flash the
connection icon. The user needs to connect the probe. The test can then
proceed when the Green or Enter button is pressed. At the end of each test
in the test sequence, the display will indicate the result.
Isolated Test
This is a normal Earth Bond Test where the EUT is plugged into the Tester
power socket and the Earth Bond lead is connected to the EUT. This is the
default test.
If any test in the test sequence fails, then the test sequence is aborted and
a fail is displayed. A Failure Menu may be shown if the option is selected
(see SYSTEM CONFIGURATION Options.)
When you have completed testing the EUT you can enter comments.
The Test Results can be reviewed before entering any comments by
selecting the REVIEW RESULTS Fast key.
It is also possible to compare the new Test Results with any previous Test
Results stored in memory for the same Appliance at the same Site.
To compare the new Test Results with previous Test Results select the
COMPARE RESULTS Fast key.
Note
If there are more than one set of Test Results found in memory,
the Results Comparison will be with the latest chronological Test
Results.
To enter comments, use the keyboard and enter comments into the box.
Press Enter for a new line. To store the comments press the OK Fast key.
Your results and comments will now be stored.
HOW TO PERFORM AUTOMATIC TESTS
Add Comments