EasyManua.ls Logo

KLR 950 - 9 Check List; 10 Decommissioning of the Product

Default Icon
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KLR.950 Revision: 2023-10-06
Serial numbers: 2218 - Beyond
60
9.0: CHECK LIST
When assembled in our facility, we do have a standard applied on each machine we produce to ensure
quality. To be transparent to our customer and prove that important steps have not been forgotten. Keep
in mind that most of the steps aren’t in this list because of the complexity of the machine, but the steps
that are specific to this assembly.
START UP CHECK LIST FOR BAG CLOSER KLR.950
General
Where
Tasks
Check
Opposite side
of the touch
screen, on the
body.
Make sure the nameplate is installed and filled with the correct
values:
N/A
-
Type:
-Serial:
-
Model:
-Voltage:
-
Hz:
-
Amps:
Phases:
N/A
Verify that all the
options are installed and functional
N/A
Mechanic
Where
Tasks
Check
Breaker part
Do a cycle
and make sure the correct option is installed according
the customer needs (break or shear option):
Break
Shear
Belts
Check the
tension of each belt.
N/A
Carriage (belt
holder)
Make sure top holder is well adjusted in height to lined up with the
clips opening.
N/A
Check the top and bottom holder are parallel
N/A
Check both spring
s
are
installed,
and the tension applied to the bag
is enough
N/A
Electric
Where
Tasks
Check
Driving belt
motors
Make sure the switch number 1 on the driving belt stepper motors
are set to ON
N/A
Power supply
Power supply must be set to
28 volts factory
N/A
DATE: ______________________ TECHNICIAN SIGNATURE: ________________________________
10.0: DECOMMISSIONING OF THE PRODUCT
It is advisable to plan a tour of KLR to reinstall the equipment after a prolonged deactivation or a move,
destruction, recycling, disposal.

Table of Contents