5-38 BA 35203_04 * 3.0 * 35203_04_05_Bedienung.fm
5 Operation
Plug couplings of 3rd control circuit (FASTER block) and
additional control circuit laterally on loader unit (option)
This option (FASTER block) is only possible in connection with the SKID
STEER quickhitch!
Control circuits:
Hydraulic
connections:
For operation,
see page:
Plug coupling (3rd control circuit,
permanent operation, return without
pressure)
A 5-52
Plug coupling (leak oil line) B–
Plug coupling (3rd control circuit,
permanent operation – pressure)
C 5-52
Plug coupling (additional control circuit,
return without pressure)
D
5-53
Plug coupling (additional control circuit
– pressure)
E