EasyManua.ls Logo

Krone Comprima F 155 - Page 170

Krone Comprima F 155
430 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
170
Pos: 48.105 /Übers chriften/Zwisc henüberschrift en/U-Z/Umle nkrolle/-welle vers etzen @ 505 \mod_1499407 024583_78.doc x @ 3476938 @ @ 1
Relocating the deflection roll/shaft
Pos: 48.106 /BA /Bedienung /R undballenpresse /Umlenkroll e/-welle versetzen _Bild @ 505\ mod_149934907 0443_78.doc x @ 3476760 @ @ 1
COM00587
1 2
I
II
4
3
4
3
I
II
Fig.
141
Pos: 48.107 /BA /Bedienung /R undballenpresse /Umlenkroll e/-welle versetzen _Text @ 505\ mod_149934 9017435_78.doc x @ 3476728 @ @ 1
If the bale formation conveyor cannot be tensioned sufficiently by means of the above-described
method, or if the bale formation conveyor tension decreases, you can relocate the deflection
roll/shaft (4) to increase the tension path.
Position [I]: Deflection roll/shaft (4) and scraper (3) in original position
Position [II]: Deflection roll/shaft (4) and scraper (3) in new position for tensioning the bale
formation conveyor
Unlock the side hood (1) on the left side of the machine and fold it up.
Dismount the side guard (2) on the left side of the machine.
Remove the scraper (3) from position [I] and mount it in position [II].
Unscrew the threaded pin to remove the adjusting ring at the screw connection of the
deflection shaft (4).
Remove the screw connection of the deflection shaft (4).
Remove the deflection roll/shaft (4) from position [I] and mount it in position [II].
Slide the adjusting ring onto the deflection shaft (4) and secure with the threaded pin.
Mount the side guard (2).
Close the side hood (1).
Pos: 48.108 /Layo ut Module /---------------Seitenumbruch---------------- @ 0\mod_1196 175311226_0.d ocx @ 4165 @ @ 1

Table of Contents

Other manuals for Krone Comprima F 155

Related product manuals