30
ENGLISH
3. Installation
t 5IFJOTUBMMBUJPONVTUCFDBSSJFEPVUCZBVUIPSJ[FE-B4BO.BSDPUFDIOJDBMQFSTPOOFM
t 5IFDPGGFFNBDIJOFJTEFMJWFSFEJOBTVJUBCMFQBDLJOH5IFQBDLJOHDPOUBJOTUIFNBDIJ-
OFBOEJUTBDDFTTPSJFTUIFVTFSNBOVBMBOEUIFDPOGPSNJUZEFDMBSBUJPO"GUFSPQFOJOH
UIFQBDLJOHDIFDLUIFQSPQFSDPOEJUJPOPGUIFDPGGFFNBDIJOFBOEJUTDPNQPOFOUT*O
DBTFPGEPVCUEPOPUVTFUIFBQQMJBODFBOEDPOUBDU-B4BO.BSDP4Q"
t "MMPGUIFQBDLBHJOHNVTUCFDBSFGVMMZDPOTFSWFEJODBTFUIFNBDIJOFOFFETUPCFUSBO-
sported in the future.
t 5IF NBDIJOFTIPVME CF QMBDFE POB QFSGFDUMZ IPSJ[POUBM QMBOFTVGmDJFOUMZ TUVSEZ UP
TVQQPSUUIFXFJHIUPGUIFNBDIJOFXJUIBTVGmDJFOUDMFBSBODFBSPVOEJUUPEJTTJQBUFUIF
heat generated during its operation.
t %POPUJOTUBMMUIFFTQSFTTPDPGGFFNBDIJOFJOQMBDFTXIFSFDMFBOJOHJTMJLFMZUPCFDBS-
SJFEPVUXJUIKFUTPGXBUFS%POPUJNNFSHFUIFVOJUJOXBUFSUPDMFBOJU
t 'PSTBGFUZBHBJOTUIB[BSETSFMBUFEUPFMFDUSJDBMDVSSFOUTLFFQUIFNBDIJOFBXBZGSPN
TJOLTUVCTBRVBSJVNTUBQTBOEBSFBTUIBUBSFXFUPSXIFSFXBUFSNBZTQMBTI
t 5IFNBDIJOFDSFBUFTIFBU5IFSFGPSFJUOFFETUPCFQMBDFEJOBSPPNUIBUJTTVGmDJFOUMZ
WFOUJMBUFEUPFOTVSFIFBUEJTTJQBUJPO,FFQUIFNBDIJOFBXBZGSPNTPVSDFTPGEJSFDU
heat.
t .BLFTVSFUIBUUIFWPMUBHFPGUIFQPXFSTPDLFUEPFTOPUEJGGFSGSPNUIBUJOEJDBUFEPO
UIFUFDIOJDBMEBUBBOEPOUIFJEFOUJmDBUJPOUBHPOUIFNBDIJOF*GUIFWPMUBHFJTEJGGF-
SFOUEPOPUDPOOFDUUIFNBDIJOF5IJTNBZCFEBOHFSPVTBOENBZEBNBHFUIFVOJU
3.1 Equipment provided
The machine packing contains the equipment kit, which includes the following items:
– lter cups with lter restraint ring
– lters for lter cups (single and double doses)
– blind lter for lter cup
– spouts for lter cups (single and double doses)
– press for ground coffee
– rubber tube with stainless steel mesh for water connection (water circuit - water softener)
– rubber drain hose with steel coil for water drain
– 3/8” nipples for hose connection to water supply tube
– cleaning brush for serving units
3.2 Water mains set-up
FEEDING LINE
Bring the water feeding tube (of at least 3/8” diameter) up to the machine and install an on-off valve (preferably of
3/8” ball type) that allows a rapid opening and closing operation.
DRAIN LINE
Provide an inspectable drainage pit on the oor connected with the sink drainage line, suitable for receiving
the machine gravity drainage tube. The drain tube must be positioned so that the water ows out freely, with-
out possibility for the pipe to clog up during the operation.
3.3 Water softener (optional)
5IFXBUFSTPGUFOFSGPSTPGUFOJOHUIFNBJOTXBUFSDBOCFNBOVBMPSBVUPNBUJDEFQFOEJOHPO
customer’s request.
#FGPSFDPOOFDUJOHUIFXBUFSTPGUFOFSUPUIFDPGGFFNBDIJOFUIFSFTJOTDPOUBJOFEJOJUTIPVMECF
XBTIFEPGGBTEFTDSJCFEJOUIFVTFSTNBOVBMTVQQMJFEXJUIUIFBQQMJBODF
/PUF
5IFXBUFSTPGUFOFSJTDPOTJEFSFEBOFTTFOUJBMEFWJDFUPHVBSBOUFFBQSPQFSPQFSBUJPOPGUIFFTQSFTTPDPGGFFNB-
DIJOF"XBUFSTPGUFOJOHTZTUFNTIPVMECFQSPWJEFEJOPSEFSUPHVBSBOUFFUIFFGmDJFODZQFSGPSNBODFBOEEVSBUJPO
of the components in the machine.