EasyManua.ls Logo

LEM Saturn 100 Plus - Page 34

LEM Saturn 100 Plus
329 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Measuring
32
sufficient. If the measured value changes, reposition the probe until the measured
value remains unchanged.
Measurements without Probe:
If the structural layout makes it impossible to set a probe, the probe line may thus
be connected to the earthed/grounded neutral wire (N wire). As in this measuring
method the resistance of the system earth/ground connection (R
B
) is included in
the measurement, the measured value should be corrected by the formula
R
A
= R
measured
- R
B
As the system earthing/grounding resistance may be max. 2 Ohm as per DIN VDE
0100 and is known only rarely, it is recommended to ignore the system
earthing/grounding resistance. The measured value then includes the value of R
B
as an increased factor of safety.
Error Messages:
Flashing symbols on the display generally signify illegal conditions or errors,; for
further information see section 3.11 „Display hints“.

Table of Contents

Related product manuals